We excavated an existing bank, creating space for us to build a reinforced concrete structure suitable to bolt into for others to erect a canopied bike shelter suitably sized to meet operational needs.
We also undertook regrading of the adjacent bank, relocation of existing lamppost (into new sleeve), installed kerbs, tactile paving and made good the crossing point in tarmac.


